Redmond plan check and resubmittal guide
What we could verify about the City of Redmond’s permit office from government and permit portal pages, what Washington law says about plan check there, and how to answer a correction letter. Each fact links to its source.
The City of Redmond permit office
- Development Services Center: 425-556-7000 (redmond.gov, checked October 31, 2026)
- Address: 15670 NE 85th Street, Second Floor, Mail Stop 2SPL, Redmond, WA 98052 (redmond.gov, checked October 31, 2026)
- Building department page
Links and facts checked on October 28, 2026.
Codes its letters cite
Building code named on the city’s pages: 2021 Code Editions and Amendments Effective March 15, 2024.
Local amendments to the building code
Any city or county may amend the state building code; amendments that affect houses and apartments need State Building Code Council approval first.
Redmond and King County
Redmond is in King County. See the King County guide.
Washington rules every plan check here follows
These come from Washington law and state agencies, so they apply in Redmond as well. Each links to its source.
Building code in force
Washington's current building code is based on the 2021 model codes and took effect on March 15, 2024.
Source: Washington State Building Code Council, checked October 31, 2026
Next edition
The next update, based on the 2024 codes, is scheduled to take effect on May 3, 2027.
Source: Washington State Building Code Council, checked October 31, 2026
Local amendments
A city or county may change the state code for its own area, but its changes cannot weaken the code's minimum standards.
Source: Washington State Legislature, RCW 19.27.040, checked October 31, 2026
Rules are locked in when you apply
A complete building permit application is reviewed under the building and zoning rules that were in effect on the date it was filed.
Source: Washington State Legislature, RCW 19.27.095, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of Redmond’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Washington city guides
How we help
Send us the whole Additional Information Issues Matrix. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Redmond yourself.
Cleared to Build is an independent service. We are not the City of Redmond and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
What does the City of Redmond call its correction letter?
The City of Redmond calls it “Additional Information Issues Matrix”.
How do I respond to Redmond’s plan check corrections?
In general, answer every comment in a response letter that says what changed and on which sheet, then resubmit the revised drawings the way the City of Redmond asks. Check its own instructions first.
What should a resubmittal to Redmond include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of Redmond may ask for more, so check with it before you send.
Where do I send my resubmittal to Redmond?
The City of Redmond’s online permit portal is Redmond ePermitting Service (REPS), linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Redmond take to review a resubmittal?
Review times change with workload. Ask the building department at 425-556-7000.
Whom do I ask about Redmond’s plan check corrections?
Call Development Services Center at 425-556-7000. For a question about one comment, ask for the reviewer named on the letter.
Does Redmond charge for another plan review?
This guide doesn’t list fees. Ask Development Services Center at 425-556-7000 before you resubmit.
How many rounds of corrections can Redmond send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Development Services Center at 425-556-7000 if unsure.