Fairview plan check and resubmittal guide
What we could verify about the City of Fairview’s permit office from government and permit portal pages, what Oregon law says about plan check there, and how to answer a correction letter. Each fact links to its source.
The City of Fairview permit office
- Building Services (fairvieworegon.gov, checked October 31, 2026): 503-674-6206 (fairvieworegon.gov, checked October 31, 2026)
- Address: 1300 NE Village Street, Fairview, OR 97024-3817 (fairvieworegon.gov, checked October 31, 2026)
- Building department page
Links and facts checked on October 28, 2026.
How to resubmit, at a glance
In our words, from Fairview’s own page. The exact steps are on the page linked below.
- Answer any further emailed requests for information while the application is being processed.
From Fairview’s own page, read October 31, 2026: fairvieworegon.gov
Codes its letters cite
Local amendments to the building code
The state building code is uniform statewide: cities and counties may not set different requirements unless the state Building Codes Division authorizes them.
Fairview and Multnomah County
Fairview is in Multnomah County. See the Multnomah County guide.
Oregon rules every plan check here follows
These come from Oregon law and state agencies, so they apply in Fairview as well. Each links to its source.
Residential code
The 2026 Oregon Residential Specialty Code took effect on Oct. 1, 2026. Chapter 1 is already mandatory; Chapters 2 - 44 and the appendices become mandatory on April 1, 2027.
Source: Oregon Building Codes Division, checked October 31, 2026
Commercial (structural) code
Commercial buildings follow the 2025 Oregon Structural Specialty Code. It took effect Oct. 1, 2025, and after a 6-month phase-in became mandatory on April 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
Commercial energy code
Energy rules for commercial buildings come from the 2025 Oregon Energy Efficiency Specialty Code, mandatory since July 1, 2025.
Source: Oregon Building Codes Division, checked October 31, 2026
Electrical code
Electrical work follows the 2026 Oregon Electrical Specialty Code, based on the 2026 National Electrical Code, in effect since Oct. 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
Plumbing code
Plumbing work follows the 2026 Oregon Plumbing Specialty Code, based on the 2024 Uniform Plumbing Code, in effect since Oct. 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of Fairview’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Oregon city guides
How we help
Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Fairview yourself.
Cleared to Build is an independent service. We are not the City of Fairview and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
How do I respond to Fairview’s plan check corrections?
In short: Answer any further emailed requests for information while the application is being processed. Answer every comment in a response letter that says what changed and on which sheet.
What should a resubmittal to Fairview include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of Fairview may ask for more, so check with it before you send.
Where do I send my resubmittal to Fairview?
The City of Fairview’s online permit portal is ePermitting, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Fairview take to review a resubmittal?
Review times change with workload. Ask the building department at 503-674-6206.
Does Fairview charge for another plan review?
This guide doesn’t list fees. Ask Building Services at 503-674-6206 before you resubmit.
How many rounds of corrections can Fairview send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Services at 503-674-6206 if unsure.
Is Cleared to Build part of the City of Fairview?
No. Cleared to Build is an independent service, not affiliated with the City of Fairview or any permitting agency. You submit to the city yourself.