How to respond to Kennewick plan check corrections
What the City of Kennewick calls its correction letter, how to resubmit, and what to include, from the city’s own pages. Each fact links to its source.
How to resubmit
- Building plans are reviewed by the Building Safety Division and the Fire Department; you are notified of any changes that need to be made.
- Address the comments and resubmit revised plans, as needed.
- Once all comments are addressed, final fees are calculated and the permit paperwork is prepared for issuance.
From the city’s instructions: go2kennewick.com
Codes its letters cite
Local code abbreviations you will see on the City of Kennewick letters: KMC.
Building code named on the city’s pages: 2021 INTERNATIONAL BUILDING CODE.
Local amendments to the building code
Any city or county may amend the state building code; amendments that affect houses and apartments need State Building Code Council approval first.
Official links
- Building department page
- Building Safety Division: 509-585-4561 (go2kennewick.com, checked October 31, 2026)
- Address: 210 W 6th Avenue, Kennewick, WA 99336 (go2kennewick.com, checked October 31, 2026)
Links and facts checked on October 28, 2026.
Washington rules every plan check here follows
These come from Washington law and state agencies, so they apply in Kennewick as well. Each links to its source.
Building code in force
Washington's current building code is based on the 2021 model codes and took effect on March 15, 2024.
Source: Washington State Building Code Council, checked October 31, 2026
Next edition
The next update, based on the 2024 codes, is scheduled to take effect on May 3, 2027.
Source: Washington State Building Code Council, checked October 31, 2026
Local amendments
A city or county may change the state code for its own area, but its changes cannot weaken the code's minimum standards.
Source: Washington State Legislature, RCW 19.27.040, checked October 31, 2026
Rules are locked in when you apply
A complete building permit application is reviewed under the building and zoning rules that were in effect on the date it was filed.
Source: Washington State Legislature, RCW 19.27.095, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of Kennewick’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Washington city guides
How we help
Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Kennewick yourself.
Cleared to Build is an independent service. We are not the City of Kennewick and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
How do I resubmit after the City of Kennewick sends corrections?
Building plans are reviewed by the Building Safety Division and the Fire Department; you are notified of any changes that need to be made.; then Address the comments and resubmit revised plans, as needed.; then Once all comments are addressed, final fees are calculated and the permit paperwork is prepared for issuance.
How do I respond to Kennewick’s plan check corrections?
In general, answer every comment in a response letter that says what changed and on which sheet, then resubmit the revised drawings the way the City of Kennewick asks. Check its own instructions first.
What should a resubmittal to Kennewick include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of Kennewick may ask for more, so check with it before you send.
Where do I send my resubmittal to Kennewick?
The City of Kennewick’s online permit portal is Permitting Self Service Portal, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Kennewick take to review a resubmittal?
Review times change with workload. Ask the building department at 509-585-4561.
Does Kennewick charge for another plan review?
This guide doesn’t list fees. Ask Building Safety Division at 509-585-4561 before you resubmit.
How many rounds of corrections can Kennewick send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Safety Division at 509-585-4561 if unsure.