How to respond to Cle Elum plan check corrections

How to resubmit to the City of Cle Elum after plan check corrections, in the words of Cle Elum’s own page. Each fact links to its source.

From Cle Elum’s own page, read October 30, 2026: cleelum.gov

How to resubmit, at a glance

In our words, from Cle Elum’s own page. The exact steps are on the page linked below.

  1. Pay the required deposit so a permit number gets assigned.

From Cle Elum’s own page, read October 31, 2026: cleelum.gov

What to include

From Cle Elum’s own page, read October 30, 2026: cleelum.gov

Codes its letters cite

Building code named on the city’s pages: 2021 International Building Code (IBC).

Source: cleelum.gov

Local amendments to the building code

Any city or county may amend the state building code; amendments that affect houses and apartments need State Building Code Council approval first.

Source: app.leg.wa.gov

Official links

Links and facts checked on October 28, 2026.

Washington rules every plan check here follows

These come from Washington law and state agencies, so they apply in Cle Elum as well. Each links to its source.

Building code in force

Washington's current building code is based on the 2021 model codes and took effect on March 15, 2024.

Source: Washington State Building Code Council, checked October 31, 2026

Next edition

The next update, based on the 2024 codes, is scheduled to take effect on May 3, 2027.

Source: Washington State Building Code Council, checked October 31, 2026

Local amendments

A city or county may change the state code for its own area, but its changes cannot weaken the code's minimum standards.

Source: Washington State Legislature, RCW 19.27.040, checked October 31, 2026

Rules are locked in when you apply

A complete building permit application is reviewed under the building and zoning rules that were in effect on the date it was filed.

Source: Washington State Legislature, RCW 19.27.095, checked October 31, 2026

What a good response to plan check corrections has

General guidance, not the City of Cle Elum’s own rules. Check its page before you resubmit.

Other Washington city guides

How we help

Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Cle Elum yourself.

Cleared to Build is an independent service. We are not the City of Cle Elum and are not affiliated with it.

Upload your correction letter

Only one comment to answer? Try the free one-comment tool.

Questions

How do I respond to Cle Elum’s plan check corrections?

In short: Pay the required deposit so a permit number gets assigned. Answer every comment in a response letter that says what changed and on which sheet.

How long does Cle Elum take to review a resubmittal?

Review times change with workload. Ask the building department at (509) 674-2262.

Does Cle Elum charge for another plan review?

This guide doesn’t list fees. Ask Building Department at (509) 674-2262 before you resubmit.

How many rounds of corrections can Cle Elum send?

This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Department at (509) 674-2262 if unsure.

Is Cleared to Build part of the City of Cle Elum?

No. Cleared to Build is an independent service, not affiliated with the City of Cle Elum or any permitting agency. You submit to the city yourself.