Plano plan check and resubmittal guide
What we could verify about the City of Plano’s permit office from government and permit portal pages, what Texas law says about plan check there, and how to answer a correction letter. Each fact links to its source.
The City of Plano permit office
- Building Inspections (plano.gov, checked October 31, 2026): 972-941-7140 (content.civicplus.com, checked October 31, 2026)
- Address: 1520 K Ave, Suite 140, Plano, TX 75074 (content.civicplus.com, checked October 31, 2026)
- Permit portal (eTRAKiT)
- Building department page
- Permit open data
Links and facts checked on October 30, 2026.
Codes its letters cite
Building code named on the city’s pages: 2024 Edition of the International Building Code, with certain additions, deletions, and amendments.
Local amendments to the building code
Adopts the North Central Texas (NCTCOG) regional code amendments; adopts it with its own changes (NCTCOG 2026 survey).
Sections the City of Plano changes from the state code (summaries in our words; read the ordinance for the exact text):
- IRC R102.4: Referenced codes and standards are part of the code; locally adopted amendments apply to each reference.
- IRC R104.2.3.1: Flood hazard area provisions deleted; floodplain administration handled by other city departments.
- IRC R104.3.1: Flood hazard provisions deleted; floodplain provisions are addressed locally.
- IRC R106.1.4: Flood hazard provisions deleted; floodplain provisions are addressed locally.
- IRC R104.7: Amended; see the ordinance
- IRC R105.3: Item 5 on valuation of work deleted from permit application requirements.
- IRC R110.1: Use and change of occupancy text revised; certificate of occupancy requirement modified.
- IRC R110.2: Certificate issued section deleted in its entirety.
- IRC Table R301.2: Local climatic and geographic design criteria values filled in for the table.
- IRC R302.1: Exception 6 added to exterior wall requirements.
- IRC R302.2.6: Exception 6 deleted from structural independence requirements.
- IRC R309.2: One- and two-family automatic sprinkler system requirements deleted in their entirety.
The ordinance amends more sections than these.
Plano and Collin County
Plano is in Collin County.
Texas rules every plan check here follows
These come from Texas law and state agencies, so they apply in Plano as well. Each links to its source.
Code for homes
For houses, Texas cities start from the International Residential Code as it stood on May 1, 2012.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
Code for commercial buildings
For commercial buildings, Texas cities start from the International Building Code as it stood on May 1, 2012.
Source: Texas Local Government Code § 214.216, checked October 31, 2026
Local amendments
Each city can set its own procedures to add to, change, or remove parts of the residential code, and to run its own enforcement.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
Newer code editions
Cities may also consider later code changes published after May 1, 2012, so ask your building department which edition it enforces.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of Plano’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Texas city guides
How we help
Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Plano yourself.
Cleared to Build is an independent service. We are not the City of Plano and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
How do I respond to Plano’s plan check corrections?
In general, answer every comment in a response letter that says what changed and on which sheet, then resubmit the revised drawings the way the City of Plano asks. Check its own instructions first.
What should a resubmittal to Plano include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of Plano may ask for more, so check with it before you send.
Where do I send my resubmittal to Plano?
The City of Plano’s online permit portal is eTRAKiT portal, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Plano take to review a resubmittal?
Review times change with workload. Ask the building department at 972-941-7140.
Whom do I ask about Plano’s plan check corrections?
Call Building Inspections at 972-941-7140. For a question about one comment, ask for the reviewer named on the letter.
Does Plano charge for another plan review?
This guide doesn’t list fees. Ask Building Inspections at 972-941-7140 before you resubmit.
How many rounds of corrections can Plano send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Inspections at 972-941-7140 if unsure.
Is Cleared to Build part of the City of Plano?
No. Cleared to Build is an independent service, not affiliated with the City of Plano or any permitting agency. You submit to the city yourself.