Denison plan check and resubmittal guide
What we could verify about the City of Denison’s permit office from government and permit portal pages, what Texas law says about plan check there, and how to answer a correction letter. Each fact links to its source.
The City of Denison permit office
- Building Department (denisontx.gov, checked October 31, 2026): 903-465-2720 (denisontx.gov, checked October 31, 2026)
- Address: 500 W. Chestnut, Denison, TX 75020 (denisontx.gov, checked October 31, 2026)
- Building department page
Links and facts checked on October 30, 2026.
Codes its letters cite
Building code named on the city’s pages: 2024 International Building Code.
Local amendments to the building code
Adopted local amendments.
Sections the City of Denison changes from the state code (summaries in our words; read the ordinance for the exact text):
- CHAPTER28 28.49: Amends permitted zones for Data Centers; adds Telecommunications Facility as a permitted use.
- CHAPTER26 26-826: Provides a smaller minimum capacity for newly installed grease interceptors.
- CHAPTER25 25-154: Revises rules on parking of trailers on residential streets.
- CHAPTER13 13-162: Allows demolitions to proceed through the Municipal Court process.
- CHAPTER3 3-2: Revises license, permit, or certificate provisions regarding local fees.
- CHAPTER25 25-136.1: Adds stop signs at US Hwy 75 frontage at Loy Lake and Crawford Roads.
- CHAPTER26 26-114: Revises authority to require pretreatment and monitoring facilities.
- CHAPTER28 28.46: Amended; see the ordinance
- CITYOFDENISONCODEOFORDINANCES 25.22: Adds new Section 25.22, "Affirmative Defenses."
- CHAPTER25 25-202: Repeals Section 25-202, "Obstructing Crossings."
- ZONINGORDINANCE 28.51: Amends landscaping requirements contained in Section 28.51.
- ZONINGORDINANCE Appendix C: Amends landscaping requirements contained in Appendix C.
Denison and Grayson County
Denison is in Grayson County.
Texas rules every plan check here follows
These come from Texas law and state agencies, so they apply in Denison as well. Each links to its source.
Code for homes
For houses, Texas cities start from the International Residential Code as it stood on May 1, 2012.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
Code for commercial buildings
For commercial buildings, Texas cities start from the International Building Code as it stood on May 1, 2012.
Source: Texas Local Government Code § 214.216, checked October 31, 2026
Local amendments
Each city can set its own procedures to add to, change, or remove parts of the residential code, and to run its own enforcement.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
Newer code editions
Cities may also consider later code changes published after May 1, 2012, so ask your building department which edition it enforces.
Source: Texas Local Government Code § 214.212, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of Denison’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Texas city guides
How we help
Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of Denison yourself.
Cleared to Build is an independent service. We are not the City of Denison and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
How do I respond to Denison’s plan check corrections?
In general, answer every comment in a response letter that says what changed and on which sheet, then resubmit the revised drawings the way the City of Denison asks. Check its own instructions first.
What should a resubmittal to Denison include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of Denison may ask for more, so check with it before you send.
Where do I send my resubmittal to Denison?
The City of Denison’s online permit portal is MGO portal, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Denison take to review a resubmittal?
Review times change with workload. Ask the building department at 903-465-2720.
Does Denison charge for another plan review?
This guide doesn’t list fees. Ask Building Department at 903-465-2720 before you resubmit.
How many rounds of corrections can Denison send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Department at 903-465-2720 if unsure.
Is Cleared to Build part of the City of Denison?
No. Cleared to Build is an independent service, not affiliated with the City of Denison or any permitting agency. You submit to the city yourself.