King City plan check and resubmittal guide
What we could verify about the City of King City’s permit office from government and permit portal pages, what Oregon law says about plan check there, and how to answer a correction letter. Each fact links to its source.
The City of King City permit office
- Building Code Services (ci.king-city.or.us, checked October 31, 2026): 503-639-4082 (ci.king-city.or.us, checked October 31, 2026)
- Address: 15300 SW 116th Ave., King City, OR 97224 (ci.king-city.or.us, checked October 31, 2026)
- Building department page
Links and facts checked on October 28, 2026.
Codes its letters cite
Local amendments to the building code
The state building code is uniform statewide: cities and counties may not set different requirements unless the state Building Codes Division authorizes them.
King City and Washington County
King City is in Washington County. See the Washington County guide.
Oregon rules every plan check here follows
These come from Oregon law and state agencies, so they apply in King City as well. Each links to its source.
Residential code
The 2026 Oregon Residential Specialty Code took effect on Oct. 1, 2026. Chapter 1 is already mandatory; Chapters 2 - 44 and the appendices become mandatory on April 1, 2027.
Source: Oregon Building Codes Division, checked October 31, 2026
Commercial (structural) code
Commercial buildings follow the 2025 Oregon Structural Specialty Code. It took effect Oct. 1, 2025, and after a 6-month phase-in became mandatory on April 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
Commercial energy code
Energy rules for commercial buildings come from the 2025 Oregon Energy Efficiency Specialty Code, mandatory since July 1, 2025.
Source: Oregon Building Codes Division, checked October 31, 2026
Electrical code
Electrical work follows the 2026 Oregon Electrical Specialty Code, based on the 2026 National Electrical Code, in effect since Oct. 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
Plumbing code
Plumbing work follows the 2026 Oregon Plumbing Specialty Code, based on the 2024 Uniform Plumbing Code, in effect since Oct. 1, 2026.
Source: Oregon Building Codes Division, checked October 31, 2026
What a good response to plan check corrections has
General guidance, not the City of King City’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Oregon city guides
How we help
Send us the whole correction letter. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to the City of King City yourself.
Cleared to Build is an independent service. We are not the City of King City and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
How do I respond to King City’s plan check corrections?
In general, answer every comment in a response letter that says what changed and on which sheet, then resubmit the revised drawings the way the City of King City asks. Check its own instructions first.
What should a resubmittal to King City include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. The City of King City may ask for more, so check with it before you send.
Where do I send my resubmittal to King City?
The City of King City’s online permit portal is Oregon ePermitting website, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does King City take to review a resubmittal?
Review times change with workload. Ask the building department at 503-639-4082.
Does King City charge for another plan review?
This guide doesn’t list fees. Ask Building Code Services at 503-639-4082 before you resubmit.
How many rounds of corrections can King City send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building Code Services at 503-639-4082 if unsure.
Is Cleared to Build part of the City of King City?
No. Cleared to Build is an independent service, not affiliated with the City of King City or any permitting agency. You submit to the city yourself.