How to respond to Mecklenburg County’s redlined plans
What Mecklenburg County calls its correction letter, how to resubmit, and what to include, from the city’s own pages. Each fact links to its source.
What Mecklenburg County calls it
Mecklenburg County calls its correction letter “redlined plans”.
How to resubmit after Mecklenburg County plan check corrections
- If the plans have code deficiencies when the review cycle closes, the system emails the permit applicant and the project designer that revised plans are required, with a link to upload them.
- The same link lets the project designer open the redlined plans that identify the corrections needed.
- Upload the revised plans through that link; plans and documents must be PDFs, with the plans compiled into one PDF of 40MB or less.
- Projects reviewed three or more cycles in the building discipline incur an hourly review fee of $145.00.
- Once the plans are approved the permits are issued, and the approved plans are in the contractor's account under the permit.
From the city’s instructions: code.mecknc.gov
What to include
- All plans and documents in PDF; the plans compiled into one PDF of 40MB or less
- Drawings legible, landscape and to scale: 17x11 minimum for projects over 500 sq. ft., 8 1/2x11 for projects under 500 sq. ft.
- Designer, architect or engineer name, address and contact information on the drawings
- Heated and unheated square footage of each story, and a project total
- Sheets named with CAD standard naming (A-1.0, S-2.1) and bookmarked by page
- Supporting documents as separate attachments
From the city’s instructions: code.mecknc.gov
Codes its letters cite
Building code named on the city’s pages: 2018 North Carolina State Building Code.
Local amendments to the building code
The North Carolina State Building Code applies statewide and local governments cannot amend it, except local fire-prevention rules that the state Code Council has signed off.
Official links
Links and facts checked on October 31, 2026.
North Carolina rules every plan check here follows
These come from North Carolina law and state agencies, so they apply in Mecklenburg County as well. Each links to its source.
Code for homes
The 2018 North Carolina Residential Code has applied since January 1, 2019.
Source: NC Office of State Fire Marshal, checked October 31, 2026
Other building codes
The 2018 North Carolina building, energy, fire, mechanical and plumbing codes have applied since January 1, 2019.
Source: NC Office of State Fire Marshal, checked October 31, 2026
The 2024 code is not in force yet
The 2024 North Carolina State Building Code starts 12 months after the State Fire Marshal certifies that set steps are done, so check the date before you design to it.
Source: NC State Fire Marshal letter on the 2024 code, checked October 31, 2026
What a good response to redlined plans has
General guidance, not Mecklenburg County’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other North Carolina city guides
How we help
Send us the whole redlined plans. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to Mecklenburg County yourself.
Cleared to Build is an independent service. We are not Mecklenburg County and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
What does Mecklenburg County call its correction letter?
Mecklenburg County calls it “redlined plans”.
How do I resubmit after Mecklenburg County sends corrections?
Designer can open the redlined plans via the link to see corrections.
What should a resubmittal to Mecklenburg County include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. Mecklenburg County may ask for more, so check with it before you send.
Is Cleared to Build part of Mecklenburg County?
No. Cleared to Build is an independent service, not affiliated with Mecklenburg County or any permitting agency. You submit to the city yourself.