How to respond to Pima County plan check corrections
What Pima County calls its correction letter, how to resubmit, and what to include, from the city’s own pages. Each fact links to its source.
What Pima County calls it
Pima County calls its correction letter “Notice of Request for Corrections”.
create a composite Notice of Request for Corrections
How to resubmit
- Name each resubmitted file with the County activity number, the drawing designation letter and the resubmittal number (for example P14CP00001D2 for the 2nd drawing submittal).
- Combine each type of submittal into one PDF file; do not submit a file per page.
- Revisions are separate submittals: use the original file name plus -REV and the revision number, and include only changes from the approved set.
From the city’s instructions: pima.gov
What to include
- Drawing file shall be named D
- Septic design file shall be named SD
- Structural calculations file shall be named SC
- Soils reports file shall be named SR
- Outdoor lighting file shall be named L
- Truss drawing file shall be named T
- Photograph file shall be named P
- Each type of submittal must be combined into one file
From Pima County’s own page, read October 31, 2026: pima.gov
Codes its letters cite
Building code named on the city’s pages: 2024 International Building Code.
Local amendments to the building code
Arizona has no statewide building code: each city, town and county adopts its own code edition and amendments by ordinance.
Official links
- Resubmittal instructions
- Pima County Permit Gateway
- Building department page
- Building & Site Development: (520) 724-9000 (publicworks.pima.gov, checked October 31, 2026)
- Address: 201 N. Stone Ave, Tucson, AZ 85701 (publicworks.pima.gov, checked October 31, 2026)
Links and facts checked on October 28, 2026.
What a good response to plan check corrections has
General guidance, not Pima County’s own rules. Check its page before you resubmit.
- Answer every comment, in the reviewer’s order and numbering, so nothing is missed.
- Say plainly what you changed for each comment, or why no change is needed.
- Name the sheet and detail where each change is, so the reviewer can find it fast.
- Mark changes on the drawings (clouds or deltas are common) and keep sheet numbers the same.
- Send the response letter, the revised drawings and any new calculations together.
Other Arizona city guides
How we help
Send us the whole Notice of Request for Corrections. We draft a response to every comment and list the drawing changes sheet by sheet. Your first letter is free. You review each response, then you sign and submit to Pima County yourself.
Cleared to Build is an independent service. We are not Pima County and are not affiliated with it.
Upload your correction letterOnly one comment to answer? Try the free one-comment tool.
Questions
What does Pima County call its correction letter?
Pima County calls it “Notice of Request for Corrections”.
How do I resubmit after Pima County sends corrections?
For revisions, use the original file name plus a dash and revision number.
How do I respond to Pima County’s plan check corrections?
In short: For revisions, use the original file name plus a dash and revision number. Answer every comment in a response letter that says what changed and on which sheet.
What should a resubmittal to Pima County include?
In general: a response letter answering each comment, the revised drawings with changes marked, and any new calculations or reports the comments ask for. Pima County may ask for more, so check with it before you send.
Where do I send my resubmittal to Pima County?
Pima County’s online permit portal is Pima County Permit Gateway, linked on this page. Ask the building department how it wants resubmittals sent if its instructions don’t say.
How long does Pima County take to review a resubmittal?
Review times change with workload. Ask the building department at (520) 724-9000.
Whom do I ask about Pima County’s plan check corrections?
Call Building & Site Development at (520) 724-9000. For a question about one comment, ask for the reviewer named on the letter.
Does Pima County charge for another plan review?
This guide doesn’t list fees. Ask Building & Site Development at (520) 724-9000 before you resubmit.
How many rounds of corrections can Pima County send?
This guide doesn’t list a limit. Answering every comment fully the first time is the surest way to fewer rounds; ask Building & Site Development at (520) 724-9000 if unsure.
Is Cleared to Build part of Pima County?
No. Cleared to Build is an independent service, not affiliated with Pima County or any permitting agency. You submit to the city yourself.